Create a Gantt Chart

Create a Gantt Chart

In this tip of the month, we will schedule Tasks and Mining Blocks, and create a Gantt Chart. To do so: Draw the contours of the upper and lower surface of the 3D Bench. 2. From the 3D Bench Module, found in the Modeling Category, select the command “Draw Surface”...
Schedule a 3D Drift With Colors

Schedule a 3D Drift With Colors

In this Tip Of The Month, we will create a 3D drift and schedule its advance rate with colors. To do so: Create 3 layers for the Centerline, 2D drift walls and 3D drift. On the Cenerline layer, create two intersecting centerlines using the Draw Center Line (PLDT)...
Importing Survey Data with Promine

Importing Survey Data with Promine

This month’s segment shows you how to import data points and then assign the attributes a different layer. To do so: For each item to be imported from your data point file, create a drawing for it > insert an attribute > save the drawing in Promine > Config...